热门标签

ETH博彩游戏:GCAP completes 309.28 KWp solar PV systems

时间:2周前   阅读:6   评论:2

新2代理网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

ETH博彩游戏www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,ETH博彩游戏数据开源、公平、无任何作弊可能性。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。

上一篇:皇冠官方网址:Kenanga explores collaboration with AntChain for SuperApp platform

下一篇:新2手机管理端:Spain seizes first underwater drug smuggling drones

网友评论

  • 2022-09-21 00:00:46

    Are the small inshore fishing boats big enough to be detected by the satellite cameras? 你们感觉咋样